Manufacturing / Xiamen
Make the approved detail repeatable.
The website shows only processes supported by company-supplied imagery. Capacity, tolerances and lead time are confirmed per project.
01 / Visible factory activities
From marking to pack-out.






02 / Production path
The brief follows the product.
- 01
Specification handoff
The confirmed product, marking and packing requirements become the operating reference.
- 02
Process preparation
Relevant tooling, artwork and work instructions are aligned to the approved direction.
- 03
Marking & assembly
Visible details and set composition are produced against the project brief.
- 04
Pack-out
Unit pack, labels and export configuration follow the agreed route.
- 05
Order review
Checks reference the defined product and packing requirements.
03 / What must be project-specific
Do not inherit a promise from another SKU.
Process selection, inspection criteria and production schedule depend on the selected construction and confirmed order.
- Material grade and physical dimensions
- Surface finish, coating and marking method
- Approved appearance and packaging sample
- Destination-market document requirements
- Production and delivery schedule
Manufacturing review
Connect a product record to the process.
Start with a listed product or reference and identify the changes required.